Generator proponents or new transmission load proposals should contact Tony Iserhoff, Maintenance Supervisor
FNEI will follow a fast-track process that provides preliminary assessments and preliminary cost estimates to proponents.
The Preliminary Connection Estimate and the Preliminary Connection Cost Estimate are expenses that are recoverable from the generator and load proponent.
Generators or load that will connect to the FNEI system would then proceed to Final Assessment and Cost Recovery Agreements for FNEI system modifications and connection work.